
Highlights
The 2023 Vorboss Gender Pay Gap report underscores the company's dedication to equity, inclusion, and diversity, committing to achieving gender parity in representation and pay by 2028.
2023 Vorboss Gender Pay Gap report
The gender pay gap is the difference between the average earnings of women and men across a workforce at a single point in time, expressed as a percentage of men’s earnings. It is not the same as equal pay, which refers to paying women and men the same wage for the same job.
The 2023 Vorboss Gender Pay Gap report highlights our commitment to equity, inclusion, and diversity in all business areas, including policies that encourage women to join and stay in our workforce. However, we recognise that the numbers produced by the gender pay gap alone don’t reflect the level of inclusivity and representation we aspire to achieve.
Our priority is achieving gender equality as a whole, and we have committed to reach gender parity across the company by 2028.
A highlight of the year was being recognised as one of the Sunday Times Best Places to Work in the UK and Best Places to Work for Women.
You can read the full 2023 gender pay gap report here.
Tell us about yourself so we can serve you best.
Got a question?
More articles
.png)
This special edition of our Leading London series brings together the partners behind the rollout of the City of London Corporation’s new unified network, a major upgrade designed to strengthen public services and improve connectivity across the Square Mile and beyond.
The panel included:
- Sam Collins, Assistant Director of Digital and Data, City of London Corporation
- Chelsea Chamberlin, Chief Technology Officer, Roc Technologies
- Scott McKinnon, Chief Security Officer, Palo Alto Networks
- Rhod Morgan, Chief Operations Officer, Vorboss
- Elliot Townsend, Senior Director, Juniper Networks
- Christa Elizabeth Norton, Marketing Director, Roc Technologies
Together, they explored how the new network will improve public services, strengthen cyber resilience and support a more connected, future-ready City.

For many landlords and building managers, the word “wayleave” feels like the responsible route whenever a fibre circuit is being installed on their property. It sounds formal and safe – a neat legal box to tick.
In many cases, however, a wayleave adds unnecessary complexity and delays, frustrates tenants, and can expose landlords to long-term legal risks.
At Vorboss, we’ve connected thousands of office spaces across London without a wayleave, keeping landlords in full control and getting tenants online faster.

What is a wayleave?
A wayleave is a written agreement between a landowner and a telecoms operator. It gives the operator permission to install and keep equipment on private property.
What many people don’t realise is that signing a wayleave also activates “Code rights” under the Electronic Communications Code. These rights go beyond simple permission, they give the operator legal powers to stay on the property indefinitely, access it when needed, and even refuse removal of their equipment in certain situations.
For a typical connection into a commercial building in London, a wayleave can make the fibre installation process slower, more expensive, and limit the landlord’s flexibility long term.
Why a wayleave isn’t required for standard in-building fibre connections
For a standard in-building fibre connection serving a tenant, a wayleave isn’t a legal requirement. Important protections, like building access, fire safety, repairing any damage, and removing equipment, are already covered by the tenant’s lease and usual building rules.
If no wayleave is signed, no Code rights are triggered, meaning the landlord retains full control and the installation exists under a simple, fully revocable licence.
In practice, this gives landlords far more protection and flexibility:
- No legal lock-in – the telecoms operator has no long-term rights to stay or refuse removal.
- Landlords keep full control – equipment can be moved or removed when the building changes.
- Faster fibre installation – no time lost in drafting contracts or solicitor reviews.
- Happier tenants – connections go live quicker; tenants get to move in faster.
By contrast, signing a wayleave and granting Code rights introduces a complex and expensive legal process for any fibre removal or relocation. This can take at least 18 months, plus potential court or tribunal proceedings, making it slower, and far less flexible for the landlord.
.avif)

.avif)

